Home > Predicts and Services Index > Risk Assessment

 
 
 

Risk Assessment

The current (2001 rev) L8 Apporved Code of Practice document states that:

"Before any formal health and safety management system for water systems can be implemented, a risk assessment has to be carried out to decide the possible risks. The purpose of the assessment is to enable a decision to decide:

(a) the risk to health i.e. whether the potential for harm to health from exposure is reasonably foreseeable unless adequate precautionary measures are taken;

(b) the necessary measures to prevent, or adequately control, the risk from exposure to legionella bacteria.

The risk assessment also enables the person on whom the statutory duty falls to show that all the pertinent factors, and the steps needed to prevent or control the risk, have been considered."

The CAVion Risk Assessment Service is in full compliance with the L8 Approved Code of Practice requirements, and includes the following features:

  • initial consultation meeting
  • site visit by one of our engineers
  • full and detailed report of system and risk assessment survey
  • follow-up consultation

A copy of a CAVion Risk Assessment can be made available on request.

Other useful links and information regarding Risk Assessment:

CAVion web site links:

 

Useful Links:

link to Health & Safety Executive web site

 
link to BSRIA web site
 
 
   

Powered by:
headlong IT

Copyright © 2004 CAVion Water Systems
A Division of Catalyst Support Services Ltd